Applicants are advised to keep the following documents ready for uploading in PDF format whose size should not exceed 2 MB each, before filling the application form, to avoid any inconvenience:
A. If Applying to Seek NOC for Establishment of Mobile Tower
- Registration Certificate/License granted by Department of Telecommunication, Government of India
- Structural Stability Certificate for Roof-top Pole and the certificate should be issued from any authorized Structural Engineer of any of the following: the State Building Construction Department/Local Bodies/Central Building Research Institute (CBRI), Roorkee/IITs/NITs, State Government Engineering (Civil) Colleges or any other agency authorized from time to time (if applicable)
- Structural Stability Certificate for Roof-top Towers and the certificate should be issued from any authorized Structural Engineer of any of the following: the State Building Construction Department/Local Bodies/Central Building Research Institute (CBRI), Roorkee/IITs/NITs, State Government Engineering (Civil) Colleges or any other agency authorized from time to time (if applicable)
- Structural Stability Certificate for Ground Based Tower and the certificate should be issued from any authorized Structural Engineer of any of the following: the State Building Construction Department/Local Bodies/Central Building Research Institute (CBRI), Roorkee/IITs/NITs, State Government Engineering (Civil) Colleges or any other agency authorized from time to time (if applicable)
- Type Test Certificate issued by ARAI or any other authorized agency to the manufacturer of Diesel Generator Sets (if applicable)
- Drawing of the tower with complete details including the specifications of foundations & design parameters
- Indemnity Bond (Original) to take care of any loss or injury to accident caused by the tower apart of the reasons of force-major (including a declaration to the effect that the Applicant will take necessary precautions for the safety and lighting and it shall be solely responsible for case arising there from) (if applicable)
- Location plan, site plan, elevation plan & structure plan
- NOC from building/land owner where Mobile Tower is proposed to be installed & authorized Person in case of Government premises
- Clearance from Fire Safety Department, only for high rise buildings where Fire Clearance is mandatory (if applicable)
- Any other document relevant, in the opinion of the Applicant, connected with or related to the work proposed to be undertaken (if applicable)
- Any other certificate/NOC required by authority from time to time (if applicable)
- Clearance from State Environment & Forest Department (if applicable)
- NOC from NHAI, ASI, Airport Authority (if applicable)
B. If Applying to Seek NOC for Laying of Overground Optical Fibre Cable (OFC)
- Registration Certificate/License granted by Department of Telecommunication, Government of India
- Route Plan
C. If Applying to Seek NOC for Laying of Underground Optical Fibre Cable (OFC)
- Registration Certificate/License granted by Department of Telecommunication, Government of India
- Route Plan